Factory-direct wooden toys  ·  MOQ 50 pcs  ·  EN71 & ASTM F963 reports
Stock samples ship in 48 hoursTalk to a maker
The factory

One workshop, from raw board to retail carton.

Our 6,000 m² plant in Yunhe brings the whole process under one roof: machining, sanding, painting, assembly, quality control and export packing. That is how a colour stays the same from the first order to the fourth.

Paint line at the BetterMu wooden toy factory
6,000 m²Production floor

Machining, sanding, painting, assembly, QC and packing under one roof.

80People

A settled team of cutters, sanders, painters, assemblers and QC staff.

30 daysTypical lead time

After order confirmation and artwork sign-off.

2 portsNingbo & Shanghai

FOB, CIF or EXW. Container loading and documents handled in-house.

Inside the workshop

Six things that decide the fourth shipment.

CNC cutting & drilling

Computer-controlled cutting gives repeatable parts and a clean edge. The same programme runs on the repeat order.

Sanding & edge finishing

Every edge is sanded and checked by hand. Rounded edges are a specification, not a final inspection surprise.

Water-based painting

A fixed paint recipe and a controlled drying line. Colour is checked against a master sample at the start of each run.

Assembly & fittings

Numbered fittings, jigs for repeatable assembly and a check that every carton closes with the right parts bag.

In-line QC

Checks at the cut, after sanding, after painting and before packing. A final inspection signs off the carton and the quantity.

Export packing

Retail cartons, master cartons, pallet plans and container loading. We photograph the loading for the file.

CNC machine cutting wooden toy parts
Machining

Repeatable parts, not just a good sample.

A sample can be made by hand. A production run cannot. CNC programmes, jigs and a size gauge keep the tenth thousand piece within tolerance of the first. When we quote a repeat order, the programme is already on the machine.

Finishing & QC

Colour is checked against a master, not a memory.

Every customer programme has a master colour sample. The paint recipe and the supplier are fixed, and the first pieces off the line are checked against the master before the run continues. Edges, fittings and carton contents are checked again before packing.

Packing wooden toys for export

Factory questions

Can we visit the factory?

Yes. Yunhe is about 2.5 hours by car from Hangzhou or Wenzhou. Send the dates and we will arrange the workshop visit and a sample review.

Do you make everything in-house?

Cutting, sanding, painting, assembly, QC and packing are in-house. A few specialised components, such as magnets or metal fittings, are bought from audited suppliers.

What is the production capacity?

It depends on the product mix. As a guide, 80 people across a 6,000 m² floor can handle several 40-foot containers a month of mixed wooden toys.

How do you control colour between orders?

We keep a master colour sample for each customer and check the first production pieces against it. The paint recipe and the supplier are fixed for the programme.

Work with us

Book a factory visit.

Send the dates and the products you want to see. We will arrange the workshop tour and a sample review.